When:
September 14, 2020 – September 18, 2020 all-day
2020-09-14T00:00:00-04:00
2020-09-19T00:00:00-04:00
PHASE 1 (BLUE) SEP 14-18:
• Bramblebush Terrace (NOT getting paved, but those owners will not be able to drive
across Tumbletree to get in or out)
• Crosswind Terrace
• Tumbletree Terrace
• Windy Oaks Square
REMINDER: During the scheduled phases noted below, these streets will be closed
from 7:30am-6:30pm. If your vehicle is left in a common area parking space after
7:30am, it will be towed to another location in the neighborhood, most likely the
Southern Walk Pool lot. If you need to use your vehicle, it must be relocated to
another street that is not under construction by 7:30am each workday.
Click for Full Details: https://www.broadlandshoa.org/wp-content/uploads/2020/09/Repaving-Project-Fall-2020-Info.pdf