Paving – Phase 2

When:
September 21, 2020 – September 25, 2020 all-day
2020-09-21T00:00:00-04:00
2020-09-26T00:00:00-04:00

PHASE 2 (RED) SEP 21-25:
• Hawksbury Terrace
• Royal Fern Terrace
• Schenley Terrace
• Sweetbay Terrace

REMINDER: During the scheduled phases noted below, these streets will be closed
from 7:30am-6:30pm. If your vehicle is left in a common area parking space after
7:30am, it will be towed to another location in the neighborhood, most likely the
Southern Walk Pool lot. If you need to use your vehicle, it must be relocated to
another street that is not under construction by 7:30am each workday.

Click for Full Details: https://www.broadlandshoa.org/wp-content/uploads/2020/09/Repaving-Project-Fall-2020-Info.pdf