Labor Day HOA Schedule

The Nature Center and HOA offices will be closed Friday, September 1st and Monday, September 4th for Labor Day. Pools will be closed for the 2017 season beginning Tuesday, September 5th.

PLEASE NOTE: NO trash or yard waste service on Labor Day. 

MAKE UP DAY FOR YARD WASTE ONLY: Wednesday, September 6th

This is an update from prior postings in the newsletter and Blast.

Asphalt Rejuvenation Services on HOA-Owned Roads

Broadlands has contracted with TRiTechnologies to perform asphalt rejuvenation services on the HOA-owned roads within the community. Asphalt rejuvenation extends the serviceable life of pavement for several years. The rejuvenator application penetrates the asphalt surface, replenishing the oils and provides a seal on the surface to protect the underlying pavement from the aging effects of air, sunlight, water and fuel. It seals hairline cracks and restores the flexibility that prevents cracking.  Not only does it save money, it’s also more environmentally friendly than milling and repaving on a more frequent basis.

The estimated date to start the work is in October, weather permitting. We will provide a detailed schedule of road work and updates as soon as they are available. On the scheduled day for your street, TRiTechnologies will start at 7:00 am closing down the lot/street entrance with barricades and yellow caution tape. Please remove all vehicles by 7:00 am on your scheduled work day or they will be towed at the owners’ expense. You will not be able to access your driveway for up to 36 hours, so please be prepared by parking vehicles on alternative roads.  Foot traffic will be prohibited on the surface while the streets are closed to keep the material from tracking. Crack sealing and road striping will be performed the following day and the areas will reopen to traffic within approximately 36 hours.

TRiTechnologies will try to limit the impact on the homeowners, but roadways will need to be closed and limited to pedestrian traffic on sidewalks or turf areas until the road is reopened the following day. There will be no trash pickup on work days.  Mail delivery can be completed if the carrier is able to walk in and drop the mail off.  We will communicate with the USPS, Patriot Disposal, FedEx, UPS and schools to coordinate alternative plans for these services. We appreciate your cooperation and understanding during this necessary construction period. For more information, please review the TRiTechnologies website at https://www.tritechnologiesasphaltrejuvenation.com/.  Questions may be directed to Sarah Gerstein at sarah@broadlandshoa.com or 703-729-9704.

Slurry Seal Road Work Continues with VDOT Contractors

PLEASE READ  ABOUT SLURRY SEAL PROCESS: 

QUESTIONS? Contact the following:

  • Matt May of Slurry Pavers, Inc, 804-716-7860  OR
  • Rick Kibler of VDOT 703-366-1928 OR  
  • Jeff Dilly, project superintendent 804-393-6831

These are fast operations that only impact the locations marked and where ‘No Parking’ signage is posted. Contractors will maintain safe traffic flow during these operations. Full access parking will be available after operations in the specified areas that are complete and at the end of the work days. This schedule is based off of the Contractor’s submitted work schedule and may be impacted by weather. Contractor may arrive on site before the start time of 8:00AM to prepare for work. Equipment will be parked at various locations during the progression of work and at the end of the work shift. No entrances or family recreation areas will be impacted by this equipment parking.

PLEASE NOTE: Trash/recycling services MAY be affected if your street is scheduled for maintenance. Since VDOT’s schedule could change at anytime, we are not able to reschedule trash services. Patriot will make every effort to service your street on trash days, but if  roadwork is underway and your trash/recycling cannot be collected, you will need to place your bins out again on the next scheduled pick-up day.